PIANC Panama - Agenda
Monday
Tuesday
Wednesday
Thursday
Friday
08:30 - 10:00
Session 4 - Waterway infrastructures: locks, weirs, river banks, ...
Room: Track F (Berlin 2 - 2nd Floor) - 4:3 Format
Chair/s:
Carsten Thorenz
Tu-S4-F - Inland Navigation-1
A new in-chamber double longitudinal culverts filling and emptying system for high head and large navigation lock
JUN LI, BENQIN LIU,
GENSHENG ZHAO
, GUOXIANG XUAN
Nanjing Hydraulic Research Institute, China
Tu-S4-F - Inland Navigation-2
Study on the Filling-Emptying System of Longitudinal Culvert in the Lock Floor
Wu Peng
1
, Xuan Guoxiang
2
, Cao Fengshuai
1
1
CCCC Water Transportation Consultants Co. Ltd., China,
2
Nanjing Hydraulic Research Institute, China
Tu-S4-F - Inland Navigation-3
Engineering the Levelling Systems of the Sea Locks in The Netherlands; Taking into Account the Effects of the Density Difference
Wim Kortlever
1
, Arne van der Hout
2
, Tom O'Mahoney
2
, Alexander de Loor
2
1
Rijkswaterstaat, Netherlands,
2
Deltares, Netherlands
Tu-S4-F - Inland Navigation-4
Reengineering valve opening law to optimise lock levelling: some case studies
Didier Bousmar
Hydraulic Research Laboratory, Service Public de Wallonie, Belgium